On the Critical Path

On the Critical Path

On the Critical Path


(7 de 1 utilisateurs)

0h 22m 1971 HD

Watch on the critical path FilmoFlix. Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

On the Critical Path (1971)
Tags:   #On the Critical Path 1971   #On the Critical Path Films online Complet   #Voir   #On the Critical Path en ligne   #On the Critical Path en ligne FilmoFlix   #On the Critical Path Streaming Films Gratuit   #On the Critical Path FilmoFlix Gratuit   #On the Critical Path Gratuitfilms   #ONF | NFB   #nuclear power   #candu

Commentaire

User

Similaire